Perfect Contracting completed induced controlled demolition of several large power pylons in Badgerys Creek.
The scope of work for this project involved:
- Controlled demolition of multiple 35m high power pylons;
- Installation of slings rated 2T SWL;
- Installation of chain pulls across the legs to hold structure to prevent the tower deforming during the cutting process;
- Oxy cutting legs of the tower;
- Cutting the pylon into small section;
- Loading steel into allocated skip bins for removal from site.
To carry out the demolition works was used our 24T Sumitomo Excavator was.






Perfect Group acknowledges the Aboriginal and Torres Strait Isander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.