Perfect Concrete Care completed a project directly for Sydney Trains at Wynyard Station.
The scope of work for this project involved:
- Cutting out a channel along the platform edges allowed a gap filler to be installed and close the gap from the trains to the platform;
- Obtaining precise cuts along the platform using our Husqvarna FS500 Road Saws which are capable of cutting depths of up to 680mm with millimetre precision;
- Control of the concrete slurry that the road saws produce by strict EPA guidelines so there could be zero slurry allowed to fall off the platform and onto the tracks. Using Tyrolit VCE 2000 slurry vacuums that make short work of any slurry produce solved that issue.






Perfect Group acknowledges the Aboriginal and Torres Strait Isander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.