North Ryde
Perfect Strip Out & Demolition completed the strip-out of two office levels in North Ryde.The scope of work for this project involved:Removal of existing carpet;Removal of carpet tiles;Strip-out of male and female toilets;Removal of all gyprock partitions;Removal of doors, toilet
Kent Street, Sydney CBD
Perfect Strip Out & Demolition completed demolition and strip-out of teen office levels at 321 Kent Street, Sydney CBD.The scope of work for this project involved:Dismantle workstations;Removal of ceiling tiles and grid;Removal of all floor finishes;Disassemble air conditioning ducting;Removal of
Hawke’s Brewery
Perfect Contracting completed excavating six new footings for the vat storage area of Hawke’s Brewery’s new Marrickville operation.The scope of work for this project involved:Work with extremely tight access;Break out/load out four cuts;Ripp up and remove concrete;Loaded the spoil out
Condell Park High School
Perfect Strip Out & Demolition completed perform a strip out and upgrade amenities at Condell Park High School.The scope of work for this project involved:Demolition of toilet partitions, doors, fixtures and fittings;Removal of windows and attached metal mesh complete;Disassemble floor
Chatswood
Perfect Strip Out & Demolition completed back to base demolition of 6 office levels in Chatswood.The scope of work for this project involved:Removal of all loose equipment, furniture, and storage;Demolition of existing plasterboard partitions, doors, and glazed partitions (1,358 m2);Removal
Beecroft
Perfect Strip Out & Demolition completed strip-out and demolition works at an aged care facility located in Beecroft.The scope of work for this project involved:Strip out kitchens;Demolition of laundries;Strip out bathrooms;Disassemble cold rooms;Removal of plasterboard ceiling (approximately 3,245m2);Demolition of plasterboard
Crows Nest
Perfect Contracting completed demolition of a 2000 square metre dilapidated, abandoned and fire-damaged warehouse in Crows Nest.The scope of work for this project involved:Demolition of fire-damaged roof;Hand dismantling of the roof’s unstable steel trusses and the building’s subsequent re-bracing;Hand demolition
Greenwich
Perfect Contracting completed demolition works at Greenwich in North Sydney, 3km from North Sydney CBD.The scope of work for this project involved:Demolition of the existing four-story building;Retention works for the two existing basements;Underpinning works for the third new basement;Utilising an
Central Park Mall
Perfect Contracting completed a technically challenging penetration project in Central Park Mall at Chippendale.The scope of work for this project involved:Supply and installation of 16 x 1200 x1200 multi-prop 480 Frames with braces rated at 35kN under the existing beams;Supply
The Revy
Perfect Contracting completed demolition works at Darling Point Road, Pyrmont.Standing at over 100 years old, and originally built between 1904-1912, this heritage-listed building is an iconic fixture in Sydney’s history.The scope of work for this project involved:Structural demolition of walls;Slab
Perfect Group acknowledges the Aboriginal and Torres Strait Isander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.