Company

SYDNEY Head Office
4/8 Lilian Fowler Place
Marrickville NSW 2204
(02) 8021 1784
1300 737 332

BRISBANE Office
23 Aranda Street
Slacks Creek QLD 4127
(07) 2145 6581

Mon-Fri: 7am-5pm
Sat-Sun: Closed

info@perfectgroup.au

Archive

Perfect Contracting completed works at Campbelltown Hospital as a part of Taylor Construction Group’s refurbishment works.The scope of work for this project involved:Removal of the existing rock wall for machine access;Building a spoil stockpile, erecting barricading to delineate it from

Perfect Remediation and Refurbishment completed refurbish pool at Cumberland Shire. The Cumberland Council outlined two major works: pool balancing tank remediation and pool reticulation culvert upgrade and remediation.The detailed scope of work for this project involved:Removal of the balance tank

Perfect Concrete Care completed core out of various 100mm holes along the shotcreted wall in Glenfield to test the strength in the concrete.The scope of work for this project involved:Scanning the area before coring each hole;Coring out various 100mm holes;Patching

Perfect Remediation and Refurbishment completed remediation of the heritage listed Muswellbrook Water Treatment Plan.The scope of work for this project involved:Asbestos removal and follow-up remediation;Cleaning up fecal material waste (biohazard removal) using a biohazard bubble so as to avoid further

aboriginal flagsPerfect Group acknowledges the Aboriginal and Torres Strait Isander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.