Perfect Contracting completed works at Campbelltown Hospital as a part of Taylor Construction Group’s refurbishment works.

The scope of work for this project involved:

Removal of the existing rock wall for machine access;

Building a spoil stockpile, erecting barricading to delineate it from foot traffic using the 14, bedding the loading zone with crushed concrete, protecting the existing footpath with 20mm road plates;

Bulk excavation of clay and shale in underground conditions;

Loading material into bogey drive tippers using 14t digger;

Subgrade preparation of a large area to be concrete finished;

Battered finish throughout;

Cutting and rolling of road base for concrete finish;

Setting up temporary lighting and installation of dust extraction fans;

Excavation and removal of friable-asbestos old waste pipe, disposal of in line with all EPA guidelines – sealed up and sent straight to Eastern Creek;

Removal of 6600 t waste material.

2 x 1.7t excavators, 2 x 2.5t excavators, 2 x positracks, a 4t digger, a large Telehandler and a smooth-drum roller were used in the Campbelltown project.

Perfect Contracting is proud to have been an instrumental part of this project, and we look forward to working with Taylor and the CBRE in the future.

Related projects

Perfect Group, your trusted delivery partner

With a track record of successfully delivering complex projects on time and within budget. Our team of experienced professionals and a commitment to using the latest equipment and technologies, The Perfect Group provides a comprehensive range of services that are tailored to meet the specific needs of each client. With a focus on delivering results and building long-term relationships, The Perfect Group is your trusted partner for all your project delivery needs.