PROJECT DETAILS

2020

Principal Contractor

Downer

Sector

Rail

State

NSW

Perfect Contracting completed the demolition of a full staircase, located at Birrong Station.

The scope of work for this project involved:

Installation of signage around the job site to account for road and pedestrian traffic;

Disconnection and certification of all services, installation of temporary access;

Removal of the light cladding and sections of the wall;

Core drilling;

Brace the existing staircase at the location of every lifting point to prevent buckling. Each lifting point was braced using flat bars welded to the glances of the PFCs at each lift point;

Rigging the existing stairs from lifting points by using a 500T crane;

Cutting by the rigger through the top landing using a wire saw and cutting free all steel supports with an oxytocin kit;

Processing the stairs on the ground with a 14T excavator after they lifted.

Related projects

Perfect Group, your trusted delivery partner

With a track record of successfully delivering complex projects on time and within budget. Our team of experienced professionals and a commitment to using the latest equipment and technologies, The Perfect Group provides a comprehensive range of services that are tailored to meet the specific needs of each client. With a focus on delivering results and building long-term relationships, The Perfect Group is your trusted partner for all your project delivery needs.