PROJECT DETAILS

2021

Principal Contractor

Muswellbrook Shire Council

Sector

Infrastructure

State

NSW

Perfect Remediation and Refurbishment completed remediation of the heritage listed Muswellbrook Water Treatment Plan.

The scope of work for this project involved:

Asbestos removal and follow-up remediation;

Cleaning up fecal material waste (biohazard removal) using a biohazard bubble so as to avoid further contamination;

Structural alterations;

Sealing and loading waste into a lined Perfect skip before being tipped as per EPA regs;

Craining out of friable asbestos silos gently;

Loading silos into Perfect skips, sealed, and disposed of with EPA tracking numbers;

Demolition and rebuilding of whole towers;

Modification of major trusses;

Remedial roofing works – waterproofing the entire roof and re-sheeting because of the huge damages caused by termites;

Heritage facade retention and remediation – grouting of cracks and delamination; rendering of chips and other damage, repainting all building to heritage spec.

Related projects

Perfect Group, your trusted delivery partner

With a track record of successfully delivering complex projects on time and within budget. Our team of experienced professionals and a commitment to using the latest equipment and technologies, The Perfect Group provides a comprehensive range of services that are tailored to meet the specific needs of each client. With a focus on delivering results and building long-term relationships, The Perfect Group is your trusted partner for all your project delivery needs.