Perfect Strip Out & Demolition completed commercial demolition work in Redfern Tower at 1A Lawson Square.
Strip out of the entire 12 levels of the office building back to the concrete shell, each floor being 500m2;
Demolition and removal of 4 sets of lifts across 12 levels;
Removal of all existing joinery, floor finishes, ceiling tiles, topping slabs, carpet tiles, floor tiles, redundant services and cladding back to base;
Removal of all the hazardous material within the building fit out as per the report, including friable & non-friable asbestos throughout the ceiling space within the services being demolished;
Investigation works for the new footings & columns strengthening;
Structural demolition, alterations & back propping for the basement level & ground floor which involved the removal of concrete load bearing walls & double brick walls;
Demolition of 12 bathrooms, remove floor tiles, wall tiles, ceiling tiles, fixtures and joinery, various concrete cutting for a material hoist 200mm thick;
Cutting and demolition of sup stand walls for material hoist;
Removal of render/cladding from 4 columns from all 12 levels;
Removal of all redundant equipment, single brick walls in the basement;
Saw cutting and removal of a section of the concrete façade to allow for the installation of a new hoist across 12 levels;
Loading up skip bins and sending them to disposal.