Company

SYDNEY Head Office
4/8 Lilian Fowler Place
Marrickville NSW 2204
(02) 8021 1784
1300 737 332

BRISBANE Office
23 Aranda Street
Slacks Creek QLD 4127
(07) 2145 6581

Mon-Fri: 7am-5pm
Sat-Sun: Closed

info@perfectgroup.au

Archive

Perfect Contracting completed demolition works covering dismantling and demolishing a large section of the Manildra Flour Mill, which an explosion at Manildra Flour Mill had damaged.The scope of work for this project involved:Removal of all loose debris from the structure;Deconstruction

Perfect Concrete Care completed Defit and Make Good in Rosehill.The scope of work for this project involved:Hand grinding of tactile line marking of 5000m2;Removal and rectifying the remnants of 500+ dynabolts;Concrete patching all 500 holes using Sika’s epoxy patching resin;Hand

Perfect Remediation and Refurbishment completed remediation works at A&W’s Wetherill Park plant.The scope of work for this project involved:Cleaning, forming up and reinforcing of deteriorating effluent adjustment tank containment slab; pouring a new topping slab; incorporating floating grate into the

Perfect Hire supplied manpower for Freyssinet Australia’s cathodic protection contract at the Botany BLB1 facility.Cathodic protection is a future-proofing exercise for mostly large, long, steel- or steel-containing structures to prevent them from corrosive destruction.The hired workers need to meet the

Perfect Strip Out and Demolition completed Defit and Make Good in Rosehill.The scope of work for this project involved:Remove unwanted office furniture and equipment;Dismantle temporary cool rooms and storage rooms;Strip floor coverings;Disassemble key fixtures and small plants such as compressors,

aboriginal flagsPerfect Group acknowledges the Aboriginal and Torres Strait Isander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.