Perfect Remediation and Refurbishment completed remediation of the heritage listed Muswellbrook Water Treatment Plan.
The scope of work for this project involved:
- Asbestos removal and follow-up remediation;
- Cleaning up fecal material waste (biohazard removal) using a biohazard bubble so as to avoid further contamination;
- Structural alterations;
- Sealing and loading waste into a lined Perfect skip before being tipped as per EPA regs;
- Craining out of friable asbestos silos gently;
- Loading silos into Perfect skips, sealed, and disposed of with EPA tracking numbers;
- Demolition and rebuilding of whole towers;
- Modification of major trusses;
- Remedial roofing works – waterproofing the entire roof and re-sheeting because of the huge damages caused by termites;
- Heritage façade retention and remediation – grouting of cracks and delamination; rendering of chips and other damage, repainting all building to heritage spec.






Perfect Group acknowledges the Aboriginal and Torres Strait Isander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.