Company

SYDNEY Head Office
4/8 Lilian Fowler Place
Marrickville NSW 2204
(02) 8021 1784
1300 737 332

BRISBANE Office
23 Aranda Street
Slacks Creek QLD 4127
(07) 2145 6581

Mon-Fri: 7am-5pm
Sat-Sun: Closed

info@perfectgroup.au

Garden Island

Garden Island - Perfect Contracting's project

Project Details

Location

Garden Island, NSW

Client

St Hillers

Sector

Defence

Perfect Contracting completed hazmat removal work at major Royal Australian Navy base, Garden Island.

The scope of work for this project involved:
  • Removal of 35t of friable asbestos slab in an old second storey shower block in confined space conditions, hand demolition only;
  • Removal of 300m2 of lead dust from inside a disused warehouse. Also, 300 bay lights were laden with the toxic dust which needed removal as well;
  • Removal of 100 lineal metres of lead paint on handrails throughout the same warehouse;
  • Minor demolition works.
Asbestos Removal Control Plan consisted of:
  • Jackhammering the friable concrete floor into manageable chunks;
  • Handloading chunks into extra tough friable asbestos waste bags, Sealing and double bagging them for extra security;
  • Carrying chunks up onto the new timber platform;
  • Washing the bags in the materials shower to capture any friable particles outside the bag;
  • Handing the bags to another worker in a scissor lift outside the shower block, who would then take them down to a ground level where the skip was;
  • Gently loading a lined Perfect skip to ensure the bags didn’t break.

Stringent security measures were in place at the base, including daily monitoring by ADF personnel, COVID-19 biosecurity measures, and restrictions on photography and mobile devices.

The tactical gear included a 17m knuckle boom, a medium scissor lift, Perfect’s brand new decontamination unit, skips and hook trucks, and various Hilti demo tools such as the 3000’s.

Thirty days in a HAZMAT suit is tough work, especially in March. But Perfect team did it the way they always do: with the most modern gear, the best training & leadership and a solution-oriented approach. At handover St. Hillier’s and the RAN were more than happy with our workmanship.

Perfect Group, your trusted delivery partner

With a track record of successfully delivering complex projects on time and within budget. Our team of experienced professionals and a commitment to using the latest equipment and technologies,

The Perfect Group provides a comprehensive range of services that are tailored to meet the specific needs of each client. With a focus on delivering results and building long-term relationships, The Perfect Group is your trusted partner for all your project delivery needs.

aboriginal flagsPerfect Group acknowledges the Aboriginal and Torres Strait Isander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.